| 2012 |
 Port Edward Elementary School |
$460,300 |
Complete mechanical and plumbing for a new 4500 square foot office and classroom addition and renovation of the existing 6700 square foot building with a new fire protection sprinkler system for the entire building. |
| 2011 |
 CNC Radiography Lab |
$73,000 |
Modification to the ventilation, plumbing and gas systems; installation of a new roof top air handling unit tied into the modified ductwork; and new and reworked controls to serve the new RTU and revised space requirements for the 3,000 square foot space. |
| 2010 |
 AimHi Prince George |
$242,505 |
Replacement of two multi-zone and one make up air unit for a 31,300 square foot multi-purpose building, complete with minor duct revisions, gas piping and refrigeration work. |
| 2010 |
Commonwealth Health Centre |
$111,000 |
Relocation of approximately 14 existing roof top air handling units with modifications to the ductwork and controls for the base building and some of the tenant improvement work in this approximate 46,000 square foot building. |
| 2009 |
Highland School |
$247,493 |
Replacement of 11 classroom ventilation units complete with oval exposed ducting and split system refrigeration for cooling of the 12,800 square foot renovated space. |
| 2008 |
DP Todd Secondary School |
$406,500 |
Ventilation Upgrade - Phase IV: Removing existing ventilation systems and equipment and the supply and installation of new equipment and ducting for 10,800 square feet of classroom and hallway space. |
| 2006–2008 |
Prince George Regional Hospital |
$300,000 |
5th Floor Medical School Renovation: Removal of existing supply, return and exhaust systems and installation of new supply, return and exhaust systems including new air handling equipment; and coordination of sub-contractors for controls and balancing for a 15,000 square foot hospital floor renovation. |